Production Engineering Measure. Reliability through Process Improvement (Extension to 2N2525 Transistor Family).

Abstract

Two methods of final package closure have been investigated during this quarter. They were stitch welding and cold welding. Stitch welding proved too slow to be of practical use resulting in work being concentrated on cold welding. With proper design of the cold welding dies a high yield and practical production rate can be obtained. Detailed drawings of improved ceramic package design were make and sample lots ordered. Feed-through pin seals were optimized to give a 95-100% yield of hermetic seals. (Author)

Document Details

Document Type
Technical Report
Publication Date
Aug 31, 1964
Accession Number
AD0608725

Entities

People

  • B. H. Wiley
  • G. Erkan

Tags

Communities of Interest

  • Materials and Manufacturing Processes

DTIC Thesaurus Topics

  • Cold Welding
  • Engineering
  • Hermetic Seals
  • Production
  • Production Engineering
  • Production Management Methods
  • Production Rate
  • Productivity
  • Reliability
  • Transistors
  • Welding

Fields of Study

  • Materials science

Readers

  • Metallurgy
  • Software Engineering
  • Thermal Physics or Thermal Science.