PRODUCTION ENGINEERING MEASURE TO INVESTIGATE PROPERTIES OF INDIUM ANTIMONIDE AND TO PROVIDE 801-C6 INFRARED DETECTORS.
Abstract
Twelve preproduction detectors were verbally approved and official notification to proceed into the production phase of the contract is being processed. The production pilot line facilities were physically relocated due to a reorganization, however, no modifications to processes are anticipated. Field-of-view studies were extended. Surface recombination experiments were conducted. High vacuum levels are still present in dewars stored for 3000 hours. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Jan 01, 1964
- Accession Number
- AD0609091
Entities
People
- Robert L. Smythe
- William L. Kolander
Organizations
- Texas Instruments