PRODUCTION ENGINEERING MEASURE ON HIGH PERVEANCE CATHODE-RAY TUBES.
Abstract
Three preproduction UHR tubes have been completed. Preproduction tube construction and processing are described. A list of the pilot-line manufacturing equipment is included. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Sep 08, 1964
- Accession Number
- AD0609193
Entities
People
- Edward T. Rate
Organizations
- General Electric