PRODUCTION ENGINEERING MEASURE ON HIGH PERVEANCE CATHODE-RAY TUBES.

Abstract

Three preproduction UHR tubes have been completed. Preproduction tube construction and processing are described. A list of the pilot-line manufacturing equipment is included. (Author)

Document Details

Document Type
Technical Report
Publication Date
Sep 08, 1964
Accession Number
AD0609193

Entities

People

  • Edward T. Rate

Organizations

  • General Electric

Tags

DTIC Thesaurus Topics

  • Advanced Manufacturing
  • Cathode Ray Tubes
  • Construction
  • Construction Equipment
  • Engineering
  • Manufacturing
  • Manufacturing Engineering
  • Production
  • Production Engineering
  • Production Management Methods
  • Productivity

Readers

  • Electronics Engineering
  • Software Engineering