PRODUCTION ENGINEERING MEASURE FOR MECHANIZATION OF HIGH-RELIABILITY CAPACITORS.

Abstract

Work on the production design engineering and design of pilot line equipment continues. Of the 28 major subassemblies to be used in the mechanized high--reliability capacitor assembly operation, 10 are complete, and another 14 are in various stages of production. (Author)

Document Details

Document Type
Technical Report
Publication Date
Sep 30, 1964
Accession Number
AD0609235

Entities

People

  • G. E. Walters
  • J. H. D. Folster
  • P. M. Kennedy

Organizations

  • Sprague Electric

Tags

DTIC Thesaurus Topics

  • Assembly
  • Capacitors
  • Engineering
  • High Reliability
  • Manufacturing
  • Mass Production
  • Mechanization
  • Production
  • Production Engineering
  • Production Management Methods
  • Productivity
  • Reliability

Fields of Study

  • Engineering

Readers

  • Software Engineering