RUGGEDIZED MICROWAVE DUPLEXING TUBES: PRODUCTION ENGINEERING MEASURES PROGRAM.
Abstract
During this quarter of the program, manufacture and testing of the pilot run tubes was started. The individual sections of the Inspection and Quality Control Manual were prepared. Two major problem areas during tube assembly necessitated a delay in the completion of the pilot run tubes. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Dec 12, 1963
- Accession Number
- AD0609761
Entities
People
- Paul Basken
Organizations
- M/A-COM Technology Solutions