RUGGEDIZED MICROWAVE DUPLEXING TUBES: PRODUCTION ENGINEERING MEASURES PROGRAM.

Abstract

During this quarter of the program, manufacture and testing of the pilot run tubes was started. The individual sections of the Inspection and Quality Control Manual were prepared. Two major problem areas during tube assembly necessitated a delay in the completion of the pilot run tubes. (Author)

Document Details

Document Type
Technical Report
Publication Date
Dec 12, 1963
Accession Number
AD0609761

Entities

People

  • Paul Basken

Organizations

  • M/A-COM Technology Solutions

Tags

DTIC Thesaurus Topics

  • Assembly
  • Assembly Lines
  • Engineering
  • Inspection
  • Manufacturing
  • Mass Production
  • Microwaves
  • Production
  • Production Engineering
  • Production Management Methods
  • Productivity
  • Quality Control

Readers

  • Aerospace Test and Evaluation
  • Microwave Engineering.
  • ballistics.