PRODUCTION ENGINEERING MEASURE FOR THE MANUFACTURE OF DEFLECTRON DEVICES.

Abstract

Advances gained during the eighth quarter were capitalized upon in the ninth quarter to such an extent, that a minor breakthrough was experienced, resulting in the completion of five operable tubes. One of these tubes, no. 846-1, was placed on life test at an intermim MIL-E-1E type specification and presently is still undergoing this test. At the close of this period more than 300 hrs. of life testing have been completed. Two of the five tubes completed (one of which is the life test tube) show satisfactory results at operable voltage levels; the other three are operable but are not of the quality of the forementioned tubes. The tube design has been finalized, and no further modifications are anticipated. (Author)

Document Details

Document Type
Technical Report
Publication Date
Sep 14, 1964
Accession Number
AD0609843

Entities

People

  • P. N. Oakes

Organizations

  • General Electric

Tags

DTIC Thesaurus Topics

  • Engineering
  • Life Tests
  • Production
  • Production Engineering
  • Production Management Methods
  • Productivity
  • Specifications

Readers

  • Electronics Engineering
  • Military History / Militaries and War Studies
  • Software Engineering