C-BAND TRIODE-CAVITY OSCILLATORS, PRODUCTION ENGINEERING MEASURE.
Abstract
Assembly and testing of the pilot production phase has been demonstrated as exceeding the program requirements. Testing procedures which permitted greater efficiency have been described. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Nov 30, 1964
- Accession Number
- AD0610165
Entities
People
- J. D. Marshall
Organizations
- General Electric