PRODUCTION ENGINEERING MEASURE FOR THE MANUFACTURE OF DEFLECTRON DEVICES.

Abstract

The development of an electrostatically controlled Deflectron for vidicon use is described. A total of ten one-inch tubes were completed as stipulated in the con tract, four of which were subjected to preproduction testing and the remaining six to production testing. A narration of all work and final results is given. To present the contents in an orderly fashion, the report is broken down into three sections: Section 1 - Narrative and Data; Section 2 - Electrical Test Information; Section 3 - Quality Control Manual. (Author)

Document Details

Document Type
Technical Report
Publication Date
Dec 14, 1964
Accession Number
AD0610405

Entities

People

  • P. N. Oakes

Organizations

  • General Electric

Tags

DTIC Thesaurus Topics

  • Engineering
  • Production
  • Production Engineering
  • Production Management Methods
  • Quality Control

Readers

  • Business Analytics
  • Electronics Engineering
  • Software Engineering