PRODUCTION ENGINEERING MEASURE FOR CAPACITORS, FEED-THROUGH, SOLID ELECTROLYTE TANTALUM PELLET.

Abstract

Re-aging of Group II Engineering Samples was completed. Surviving units were submitted to Quality Control for low impedance life test and other required tests. Test data was submitted for all tests. Manufacturing of preproduction samples was initiated during this quarter. Four lots, totaling 650 anode starts, were started. Additional purchase orders were placed for parts to complete the 650 anode starts. At the close of this quarter, three lots were completely assembled (450 anode starts) and two lots (300 anode starts) were started on aging in accordance with Modification No. 2 of the contract. Minor modifications were made on the anode wire positioning fixture during processing of the preproduction samples. Aging trays and fuse blocks were fabricated for aging of the preproduction samples. The insertion loss test fixture was mounted on an arbor press for increased ease and speed of making insertion loss measurements.

Document Details

Document Type
Technical Report
Publication Date
Dec 31, 1964
Accession Number
AD0611218

Entities

People

  • W. G. Bailey

Organizations

  • Cornell Dubilier

Tags

DTIC Thesaurus Topics

  • Engineering
  • Impedance
  • Insertion Loss
  • Life Tests
  • Losses
  • Manufacturing
  • Production Engineering
  • Quality Control
  • Test Fixtures

Fields of Study

  • Materials science

Readers

  • Battery Technology and Engineering
  • Electrical Engineering
  • Software Engineering