PRODUCTION ENGINEERING MEASURE FOR MECHANIZATION OF HIGH RELIABILITY CAPACITORS.

Abstract

Work on the production design engineering and design of pilot line equipment continues. Of the 29 major subassemblies to be used in the mechanized high-reliability capacitor assembly operation, 13 are complete, and another 15 are in various stages of production. The remaining machine is currently being designed. (Author)

Document Details

Document Type
Technical Report
Publication Date
Dec 30, 1964
Accession Number
AD0613365

Entities

People

  • G. E. Walters
  • J. H. D. Folster
  • P. M. Kennedy

Organizations

  • Sprague Electric

Tags

DTIC Thesaurus Topics

  • Assembly
  • Capacitors
  • Engineering
  • High Reliability
  • Manufacturing
  • Mass Production
  • Mechanization
  • Production
  • Production Engineering
  • Production Management Methods
  • Productivity
  • Reliability

Fields of Study

  • Engineering

Readers

  • Software Engineering