PRODUCTION ENGINEERING MEASURE FOR TYPE FW-202 BARRIER GRID STORAGE TUBE.

Abstract

Nine additional barrier grid tubes were assembled and exhausted during this report period. The beam current problem reported in AD-604 732 is still unresolved. A new gun was designed and will be assembled and tested during the next quarter. One barrier grid tube which meets complete specification was placed on life test. The circuitry for operating the barrier grid monitor tube was completed and is in operation. (Author)

Document Details

Document Type
Technical Report
Publication Date
Jan 01, 1964
Accession Number
AD0614926

Entities

People

  • D. D. Duggan

Tags

DTIC Thesaurus Topics

  • Engineering
  • Life Tests
  • Manufacturing Engineering
  • Production
  • Production Engineering
  • Production Management Methods
  • Productivity
  • Specifications
  • Storage Tubes

Fields of Study

  • Physics

Readers

  • Educational Psychology
  • Electrical Engineering
  • Software Engineering