PRODUCTION ENGINEERING OF TRIAXIAL PULSE CONNECTORS.
Abstract
The work performed during this period involved the following: (1) Corona reducing design modifications were discussed, with a formal proposal drawing submitted persuant to the above-mentioned discussion. (2) The production of one engineering sample per the proposal was also begun during this period. This quarter ended with no actual production of operational units nor were any tests of any kind conducted. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Mar 31, 1965
- Accession Number
- AD0615323
Entities
People
- Rocco J. Noschese