PRODUCTION ENGINEERING OF TRIAXIAL PULSE CONNECTORS.

Abstract

The work performed during this period involved the following: (1) Corona reducing design modifications were discussed, with a formal proposal drawing submitted persuant to the above-mentioned discussion. (2) The production of one engineering sample per the proposal was also begun during this period. This quarter ended with no actual production of operational units nor were any tests of any kind conducted. (Author)

Document Details

Document Type
Technical Report
Publication Date
Mar 31, 1965
Accession Number
AD0615323

Entities

People

  • Rocco J. Noschese

Tags

DTIC Thesaurus Topics

  • Connectors
  • Engineering
  • Production
  • Production Engineering
  • Production Management Methods

Readers

  • Software Engineering