PRODUCTION ENGINEERING MEASURE FOR CAPACITORS, FEED-THROUGH, SOLID ELECTROLYTE TANTALUM PELLET.

Abstract

Manufacturing and low impedance production aging was completed on the four lots of preproduction samples started in the last quarter. Production testing was completed with a yield of 73.5%. All units were submitted to quality control for preproduction qualification testing. Qualification testing was started in accordance with the preproduction inspection per Table VI of SCL-6423. The life test was started without circuit impedance. Life test failures in excess of the specification limits occurred. A TAR of proposed corrective action was submitted. Preproduction inspection testing was continued.

Document Details

Document Type
Technical Report
Publication Date
Mar 31, 1965
Accession Number
AD0615344

Entities

People

  • W. G. Bailey

Organizations

  • Cornell Dubilier

Tags

DTIC Thesaurus Topics

  • Capacitors
  • Electrical Impedance
  • Electrolytes
  • Engineering
  • Impedance
  • Inspection
  • Life Tests
  • Manufacturing
  • Manufacturing Engineering
  • Production
  • Production Engineering
  • Production Management Methods
  • Productivity
  • Qualifications
  • Quality Control
  • Specifications

Fields of Study

  • Engineering

Readers

  • Electrical Engineering
  • Software Engineering