PRODUCTION ENGINEERING MEASURE. MECHANIZATION FOR .4 WATT DIODES AND 2N560 2N1051 2N1072 2N1195 TRANSISTORS, PHASE 2.

Abstract

27 OPERATIONS WERE MECHANIZED IN Phase 1, and 21 have been refined and updated. Most modifications were directed toward improving machine repeatability and reliability. Changes in machine concept produced extensive changes on the wafering, the painting and coating, and the assembling case to stud and welding operations. Less prominent changes to the Collector Lead to Platform Welding machine has also altered the machine concept. A Tip Welding and Lead Trimming machine has overcome a header production problem, and, at the same time, mechanized the glassing mold unload and lead trimming operation. A Data Producing Test Set for diodes automatically tests and records the test results on punched cards for computer processing. This machine is primarily used during final inspection for sample testing of the diodes. An important concomitant of Phase 2 activity has been the identification of a major 'Purple Plague' factor. The results of this investigation have given positive evidence that thick aluminum contacts increase the vulnerability of bonded gold wire to 'Purple Plague'.

Document Details

Document Type
Technical Report
Publication Date
Dec 31, 1964
Accession Number
AD0615537

Entities

People

  • M. N. Reppert

Tags

DTIC Thesaurus Topics

  • Accumulators
  • Aluminum
  • Computers
  • Engineering
  • Identification
  • Information Processing
  • Inspection
  • Mechanization
  • Platforms
  • Production
  • Production Engineering
  • Production Management Methods
  • Punched Cards
  • Reliability
  • Test Sets
  • Vulnerability

Readers

  • Educational Psychology
  • Semiconductor Device Technology
  • Software Engineering