SYNTHETIC QUARTZ.

Abstract

The study was accomplished concurrently with the procurement of a pilot run of 4390 Synthetic Quartz crystals, weighing 969.9 pounds. Quantities in pilot run were sufficient for determining mass production methods and required production and test equipment. Execution of Step II, Preparedness Measures resulted in an indicated lead time gain of 0 months to the initiation of production and 3 months to peak production as compared to 'no preparedness.'

Document Details

Document Type
Technical Report
Publication Date
Nov 25, 1954
Accession Number
AD0615897

Tags

DTIC Thesaurus Topics

  • Engineering
  • Industrial Equipment
  • Industrial Preparedness
  • Lead Time
  • Mass Production
  • Procurement
  • Production
  • Production Engineering
  • Production Management Methods
  • Productivity
  • Scheduling (Production)
  • Test Equipment

Readers

  • Software Engineering
  • Thermal Physics or Thermal Science.