ON FBM SPARE PARTS USAGE RATE DEVELOPMENT,

Abstract

The problem of spare parts usage rate development for planning, provisioning, budgeting and allowance list preparation is treated for the FBM (fleet ballistic missile) logistics system. After a discussion of some data characteristics and rate possibilities, specific rate development algorithms are presented. (Author)

Document Details

Document Type
Technical Report
Publication Date
May 12, 1965
Accession Number
AD0615913

Entities

People

  • William D. Commins Jr.

Tags

DTIC Thesaurus Topics

  • Algorithms
  • Ballistic Missiles
  • Fleet Ballistic Missiles
  • Guided Missiles
  • Guided Weapons
  • Logistics
  • Spare Parts
  • Supplies

Readers

  • Logistics and Supply Chain Management.
  • Systems Analysis and Design