QUARTZ CRYSTAL UNIT CR-(XM-37)/U.

Abstract

The finishing operation has shown up as the weak link of the Pilot Run. Not all operators have shown capability in handling mounted units at these frequencies. Breakage at times has reached 25%. Experience and selection of finishers seems at present to be the best solution. The best finishers are able to set on frequency to specified tolerance with little difficulty.

Document Details

Document Type
Technical Report
Publication Date
Mar 31, 1965
Accession Number
AD0619102

Entities

People

  • Norman R. Gillin

Tags

DTIC Thesaurus Topics

  • Frequency

Fields of Study

  • Mathematics

Readers

  • Materials Science and Engineering.
  • Software Engineering