PRODUCTION ENGINEERING MEASURES FOR HIGH RELIABILITY, FIXED, FILM, PRECISION RESISTORS.

Abstract

Preproduction data for style RNR60 resistor was submitted. The Automatic Binner, Automatic Spiraller and Lead Beader were manicured and placed into operation. Delivery of the Sequential Sealer and Automatic Capper are on schedule. Those areas of the manufacturing process contributing to excessive cost are studied and evaluated, and alternative techniques aimed at reducing cost and increasing output are examined. A facility is established for the manufacture of not less than 6,000 combined units (resistors) of Mil-R-55182 styles RNR55C, RNR60C and RNR65C and 1500 units of style RNR57C per eight hour day single shift.

Document Details

Document Type
Technical Report
Publication Date
Jun 30, 1965
Accession Number
AD0620923

Entities

People

  • Richard C. Wagner

Tags

DTIC Thesaurus Topics

  • Automatic
  • Cost Reductions
  • Costs
  • Engineering
  • High Reliability
  • Manufacturing
  • Manufacturing Engineering
  • Precision
  • Production
  • Production Engineering
  • Production Management Methods
  • Reliability
  • Resistors

Fields of Study

  • Engineering

Readers

  • Software Engineering
  • Thin Film Deposition Science.