PRODUCTION ENGINEERING MEASURE FOR TYPE FW-202 BARRIER GRID STORAGE TUBE.
Abstract
The formal preproduction testing of the six preproduction samples tubes has been accomplished. The tooling for the new style guns are now in production use. The tube specification has been revised to MIL-E-1E standards. The production engineering program is now in full operation with daily tube manufacture, exhaust, testing, analysis of rejects and resultant engineering tests to improve the tube yield. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Sep 30, 1964
- Accession Number
- AD0622877
Entities
People
- D. D. Duggan