PRODUCTION ENGINEERING MEASURE FOR CERAMIC FILTERS.

Abstract

During this period effort was directed toward establishing a pre-pilot production run of ceramic resonators. Difficulties encountered in the use of the production electroding, poling, and tumble tuning fixtures are presented and discussed. Also, modifications to the production fixtures are listed. (Author)

Document Details

Document Type
Technical Report
Publication Date
Sep 29, 1965
Accession Number
AD0623978

Entities

People

  • A. Lungo

Tags

DTIC Thesaurus Topics

  • Engineering
  • Production
  • Production Engineering
  • Production Management Methods
  • Productivity

Fields of Study

  • Engineering

Readers

  • Materials Science and Engineering.
  • Software Engineering