CESIUM BEAM TUBE RESEARCH.
Abstract
During this reporting period the design of the beam tube subassemblies to be used in a demountable, bakeable beam optics chamber has been completed, except for the deflecting magnet shielding, the ion optics focussing lens, and some wiring details. Fabrication of the parts for the subassemblies and the main tube was 75% completed. Experimental work has been carried out on problems relating to the coaxial microwave cavity and the field effect transistor. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Jun 30, 1965
- Accession Number
- AD0624613
Entities
People
- Joseph H. Holloway