PRODUCTION ENGINEERING MEASURE FOR TYPE FW-202 BARRIER GRID STORAGE TUBE.
Abstract
During the report period, thirty-four tubes were placed in stock after complete specification testing. Major causes of reject tubes are still defective targets and low beam currents. The new style gun construction has greatly reduced the low beam current problem. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Dec 31, 1964
- Accession Number
- AD0625190
Entities
People
- J. D. Hagan