PRODUCTION ENGINEERING MEASURE FOR TYPE FW-202 BARRIER GRID STORAGE TUBE.

Abstract

During the report period, thirty-four tubes were placed in stock after complete specification testing. Major causes of reject tubes are still defective targets and low beam currents. The new style gun construction has greatly reduced the low beam current problem. (Author)

Document Details

Document Type
Technical Report
Publication Date
Dec 31, 1964
Accession Number
AD0625190

Entities

People

  • J. D. Hagan

Tags

DTIC Thesaurus Topics

  • Construction
  • Engineering
  • Production
  • Production Engineering
  • Production Management Methods
  • Productivity
  • Specifications
  • Storage Tubes

Readers

  • Electronics Engineering
  • Software Engineering