CUMBERLAND PLATEAU SEISMOLOGICAL OBSERVATORY
Abstract
The report reviews the analysis, engineering and research tasks which have been performed or initiated during August, September and October of 1965. During this second 3-month period of the contract, routine operations and analysis have continued at CPSO. The research tasks involving ambient noise studies, signalto-noise ratio studies and detection capability are advancing smoothly.
Document Details
- Document Type
- Technical Report
- Publication Date
- Nov 15, 1965
- Accession Number
- AD0625553
Entities
People
- Dale P. Glover
- Harry R. Lake
- James P. Edwards Iii
Organizations
- Texas Instruments