EFFECTIVE UTILIZATION OF BERTHING INSTALLATIONS DURING RECONSTRUCTION,
Abstract
The brochure uses the concrete examples of the reconstruction of existing hydraulic engineering structures in Liyepaja and Klajpeda ports to show the potentialities of creating piers answering modern requirements by means of maximum utilization of their carrying capacity. A separate chapter is devoted to organization of work in experimental loading of existing construction and calculation of its carrying capacity. The brochure is of interest for a broad circle of engineering-technical workers connected with the exploitation and planning of hydraulic engineering installations. Students specializing in hydraulic engineering in merchant marine higher institutes of learning will read it with interest. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Jan 01, 1965
- Accession Number
- AD0626717
Entities
People
- G. M. Gidal
Organizations
- United States Department of the Army