PRODUCTION ENGINEERING MEASURE FOR SUBMINIATURE, TRANSISTOR TYPE POTENTIOMETERS.
Abstract
Technical Action Request No. 8 was submitted to request changes in test requirements. These requested changes were denied. After reviewing the entire project, the decision was made to rebuild the 300 controls as proposed in Action II, TAR No. 8. Fabrication of the 300 controls was begun and a new time table was submitted to the Signal Corps for approval.
Document Details
- Document Type
- Technical Report
- Publication Date
- Sep 30, 1965
- Accession Number
- AD0628280
Entities
People
- C. L. Holmes
- D. C. Kinsey