MICROMINIATURE CRYSTAL UNIT TYPE CR-(XM-47) /U PRODUCTION ENGINEERING MEASURE.
Abstract
Progress in the second quarter resulted in the shipment of Engineering Sample No. 2 and preparation of facilities and procedures for manufacturing the production units. Manufacturing facilities installation and tooling development is on schedule. The quality control equipment was delivered to this location and will be complete when required for pre-production samples. Manpower requirements were finalized and the personnel needed made available. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Nov 26, 1965
- Accession Number
- AD0628337
Entities
People
- R. L. Hatcher
Organizations
- General Electric