MICROMINIATURE CRYSTAL UNIT TYPE CR-(XM-47) /U PRODUCTION ENGINEERING MEASURE.

Abstract

Progress in the second quarter resulted in the shipment of Engineering Sample No. 2 and preparation of facilities and procedures for manufacturing the production units. Manufacturing facilities installation and tooling development is on schedule. The quality control equipment was delivered to this location and will be complete when required for pre-production samples. Manpower requirements were finalized and the personnel needed made available. (Author)

Document Details

Document Type
Technical Report
Publication Date
Nov 26, 1965
Accession Number
AD0628337

Entities

People

  • R. L. Hatcher

Organizations

  • General Electric

Tags

DTIC Thesaurus Topics

  • Engineering
  • Engineers
  • Manpower
  • Manufacturing
  • Manufacturing Engineering
  • Production
  • Production Engineering
  • Production Management Methods
  • Productivity
  • Quality Control

Readers

  • Software Engineering