PRODUCTION ENGINEERING MEASURE FOR MECHANIZATION OF HIGH-RELIABILITY CAPACITORS.

Abstract

Work during this period consisted of making additional modifications to the machines in order to optimize their efficiency.

Document Details

Document Type
Technical Report
Publication Date
Dec 31, 1965
Accession Number
AD0630437

Entities

People

  • G. E. Walters
  • J. H. D. Folster

Organizations

  • Sprague Electric

Tags

DTIC Thesaurus Topics

  • Capacitors
  • Efficiency
  • Engineering
  • High Reliability
  • Mechanization
  • Production
  • Production Engineering
  • Production Management Methods
  • Reliability