C-6365/ARC-34C RADIO SET CONTROL.
Abstract
This report presents the results of the Second Production Reliability Acceptance Test on the C-6365/ARC-34C Radio Set Control. This test was conducted between 2 September 1965 and 15 September 1965. An accept decision was reached on 15 September 1965 with five (5) relevant failures. The total accumulated test time, at the time of the accept decision, was 6300.0 hours (8.4 normalized test times). (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Sep 15, 1965
- Accession Number
- AD0630865