A PRODUCT ENGINEERING MEASURE FOR THE IMPROVEMENT OF PRODUCTION TECHNIQUES TO INCREASE THE RELIABILITY AND TO IMPROVE PRODUCT CAPABILITY OF HIGH VOLTAGE MINIATURE SILICON RECTIFIERS.
Abstract
The work performed includes: evaluation of pellet design experiments performed during the last quarter; adoption of a final pellet design; installation of production equipment and start-up of the manufacturing line; completion of A13 matrix testing through the 2,000-hour readout; design of the A14 life test matrix; finalization of the proposed specification, except for reverse recovery testing; and presentation of environmental and life test data for devices fabricated during the third quarter. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Dec 30, 1965
- Accession Number
- AD0631364
Entities
People
- E. G. Tefft
- P. C. Whitman
- R. R. Schall
- W. R. Comstock
Organizations
- General Electric