PRODUCION ENGINEERING MEASURE CRYSTAL UNIT CR-(XM-46A).

Abstract

The reasons for the failure of the 70 MC/s preproduction samples are analyzed. The problems of the instrumentation limitations with particular reference to obtaining satisfactory values of C sub 1 are discussed. The redesign of the 70 MC/s units with reference to flatness, plateback and spot size are explained and doumented. The revised manufacturing and testing procedures now possible with the new design are presented. (Author)

Document Details

Document Type
Technical Report
Publication Date
Feb 01, 1966
Accession Number
AD0632698

Entities

People

  • Ernest B. Lewis

Tags

DTIC Thesaurus Topics

  • Engineering
  • Instrumentation
  • Manufacturing

Readers

  • Software Engineering
  • Thermal Physics or Thermal Science.