PRODUCION ENGINEERING MEASURE CRYSTAL UNIT CR-(XM-46A).
Abstract
The reasons for the failure of the 70 MC/s preproduction samples are analyzed. The problems of the instrumentation limitations with particular reference to obtaining satisfactory values of C sub 1 are discussed. The redesign of the 70 MC/s units with reference to flatness, plateback and spot size are explained and doumented. The revised manufacturing and testing procedures now possible with the new design are presented. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Feb 01, 1966
- Accession Number
- AD0632698
Entities
People
- Ernest B. Lewis