PRODUCTION ENGINEERING MEASURE FOR CAPACITORS, FEED-THROUGH, SOLID ELECTROLYTE TANTALUM PELLET.

Abstract

Four lots of the required five lots of production run units were started during this quarter. All units were completed to the point of removal from formation bars after graphite and silvering. Long vendor delivery schedules of the other capacitor parts have prevented the completion of assembly of any of these four lots of capacitors. Aging and life test facilities were started during this quarter and have progressed satisfactorily. All parts for the DC leakage monitoring circuitry for the life test have been received and preliminary wiring has been started. Capacitor manufacturing and assembly, and aging and life test facilities will be continued in the coming quarters.

Document Details

Document Type
Technical Report
Publication Date
Mar 31, 1966
Accession Number
AD0633062

Entities

People

  • W. G. Bailey

Organizations

  • Cornell Dubilier

Tags

DTIC Thesaurus Topics

  • Assembly
  • Capacitors
  • Engineering
  • Life Tests
  • Manufacturing
  • Mass Production
  • Production
  • Production Engineering
  • Test Facilities

Readers

  • Software Engineering
  • Surface Engineering/Surface Coating Technology.