MICROMINIATURE CRYSTAL UNIT TYPE CR-(XM-47) /U. PRODUCTION ENGINEERING MEASURE.
Abstract
Engineering Sample Group no. 3 was completed and shipped to the customer on schedule. The aging problem has been isolated and corrective action taken. An additional Engineering Sample Group is being submitted for evaluation. In process Quality Control equipment is complete. The reliability equipment is being assembled. Manufacturing personnel have been trained. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Feb 27, 1966
- Accession Number
- AD0633322
Entities
People
- R. D. Laney
- R. L. Hatcher
Organizations
- General Electric