PRODUCTION ENGINEERING MEASURE TO IMPROVE PRODUCTION TECHNIQUES AND INCREASE THE RELIABILITY OF THE SCL7004/21 AND SCL7004/22 TRANSISTORS.

Abstract

State-of-the-art SCL-7004/21 and SCL-7004/22 samples were supplied; a management plan--Critical Path Plan (Gantt Modified) was submitted and the initial milestone tests were initiated for SCL-7004/21 type devices. Of the seven process improvements, three are being finalized; one is in the state of continuous improvement, two are being initiated and one is scheduled to start March 1, 1966. During this quarter, the Milestone I operating live test was 80% completed and the storage life test 90% completed. The results will be presented in the next quarterly report. (Author)

Document Details

Document Type
Technical Report
Publication Date
Feb 28, 1966
Accession Number
AD0633783

Entities

People

  • R. P. Anjard

Tags

Communities of Interest

  • Materials and Manufacturing Processes

DTIC Thesaurus Topics

  • Engineering
  • Life Tests
  • Production
  • Production Engineering
  • Production Management Methods
  • Productivity
  • Reliability
  • Reliability Engineering
  • Systems Management
  • Transistors

Readers

  • Defense Acquisition Program Management
  • Electronics Engineering
  • Personnel Management and Statistics in the Military and Department of Defense