PRODUCTION ENGINEERING MEASURE FOR BERYLLIUM OXIDE AND PARTS PRODUCED FROM IMPORTED ORES.

Abstract

The purpose of the study was to produce four typical electronic parts from beryllium oxide powder with mass production type facilities. The study involved the establishment of a powder processing facility to produce a uniform powder from batch to batch in production size quantities. The second phase of the study required the development of a pilot plant fabrication line to produce uniform parts from the powder.

Document Details

Document Type
Technical Report
Publication Date
Jun 30, 1965
Accession Number
AD0634354

Entities

People

  • H. F. Lebo
  • J. F. Blum
  • J. K. Evans

Tags

DTIC Thesaurus Topics

  • Beryllium
  • Electronic Components
  • Engineering
  • Fabrication
  • Manufacturing Engineering
  • Mass Production
  • Pilot Plants
  • Production
  • Production Engineering
  • Production Management Methods
  • Productivity

Readers

  • Software Engineering
  • Surface Engineering/Surface Coating Technology.

Technology Areas

  • Microelectronics