INSTALLATION AND ENVIROMENTAL TEST OF LIGHT SIGNAL MONITOR FACILITY AN/ TSQ-( )
Abstract
A prototype Light Signal Monitor Facility AN/TSQ-( ) was subjected to specified shock, vibration, and environmental testing at Albany, Georgia. The system met or exceeded the requirements of all tests to which it was subjected. Although minor damage was sustained by the shelter as a result of the drop test, the electronic equipment continued to operate properly. A transistor failure experienced in the AN/PRC-47 Radio Set when it was switched to high power was determined to be unrelated to the system testing. Comments on the testing and recommendations for procurement systems are included.
Document Details
- Document Type
- Technical Report
- Publication Date
- Jun 01, 1966
- Accession Number
- AD0634991
Entities
People
- Gordon H. Latourette
Organizations
- SRC Inc.