PRODUCTION ENGINEERING MEASURE FOR SILICON OVERLAY TRANSISTORS.

Abstract

The following process steps are described: scribing, die breaking, die bonding, wire bonding, deionized water boil and bake, cascade rinse, bake, and weld. The efforts expended by the Reliability Program Department were in the areas of test performance, electrical parameter measurements, data analysis, and preparation of the 2N2369 specification and Quality Control Plan. (Author)

Document Details

Document Type
Technical Report
Publication Date
Mar 31, 1966
Accession Number
AD0635118

Entities

People

  • Michael Cassidy
  • Paul Greer

Organizations

  • Motorola Mobility

Tags

Communities of Interest

  • Materials and Manufacturing Processes

DTIC Thesaurus Topics

  • Data Analysis
  • Engineering
  • Measurement
  • Production
  • Production Engineering
  • Production Management Methods
  • Productivity
  • Quality Control
  • Reliability
  • Specifications
  • Transistors

Readers

  • Environmental Engineering
  • Metallurgy
  • Software Engineering