VACUUM DEPLOYMENT TESTS ON AN EXPANDABLE CREW TRANSFER TUNNEL
Abstract
An inflatable crew transfer tunnel, packaged in a canister, was tested in a simulated environment of 0.00001 torr. The canister separation, tunnel deployment, and pressurization were successfully accomplished. A tunnel leakage rate was established over a 24-hr period with the tunnel pressurized to 0.5 atm while in the simulated environment of 0.00001 torr.
Document Details
- Document Type
- Technical Report
- Publication Date
- Jul 01, 1966
- Accession Number
- AD0635196
Entities
People
- N. C. Latture
Organizations
- Arnold Engineering Development Complex