PRODUCTION ENGINEERING MEASURE FOR CAPACITORS, FEED-THROUGH SOLID, ELECTROLYTE TANTALUM PELLET.

Abstract

A revised edition of the Inspection and Quality Control Plan was submitted and approved. The balance of the capacitor end seals were received during this period, thus enabling the complete assembly of three of the five required production lots. The fourth lot was completed up to the point of doing the seal test and test for shorts. Lot five was complete to the point of welding the finished anode to the feed-through stud. Aging and life test facilities were completed during this quarter. Lots 1, 2, and 3 were placed on aging for 1000 hours, minimum. (Author)

Document Details

Document Type
Technical Report
Publication Date
Jun 30, 1966
Accession Number
AD0636575

Entities

People

  • W. G. Bailey

Organizations

  • Cornell Dubilier

Tags

DTIC Thesaurus Topics

  • Capacitors
  • End Seals
  • Engineering
  • Life Tests
  • Manufacturing
  • Production
  • Production Engineering
  • Quality Control
  • Test Facilities

Readers

  • Aerospace Test and Evaluation
  • Electrical Engineering
  • Materials Science and Engineering.