PRODUCTION ENGINEERING MEASURE FOR MECHANIZATION OF HIGH RELIABILITY CAPACITORS.

Abstract

Work in this quarter primarily was devoted to the final modification and adjustment of the machines preparatory to performing the 1200-capacitor trial run.

Document Details

Document Type
Technical Report
Publication Date
Mar 31, 1966
Accession Number
AD0636801

Entities

People

  • G. E. Walters
  • J. H. D. Folster

Organizations

  • Sprague Electric

Tags

DTIC Thesaurus Topics

  • Capacitors
  • Engineering
  • High Reliability
  • Mechanization
  • Production
  • Production Engineering
  • Production Management Methods
  • Productivity
  • Reliability