FORECAST III. FORECAST MOCKUP SYSTEM TECHNICAL DESCRIPTION.

Abstract

The training devices described were specifically developed to support training on the Improved Hercules HIPAR system. The construction of these devices were carried out in Task FORECAST III, the general purpose of which was to develop training material for certain portions of the Improved Hercules HIPAR resident training program at the Ordnance Guided Missile School. The initial development of these devices occurred in FORECAST I and their experimental examination was carried out during a series of studies conducted during FORECAST II. The FORECAST Mock-ups, as are similar training devices, are generally designed to cope with two related problems. One problem concerns the availability of equipment at the training site. The second problem concerns the most effective means of utilizing training equipment. (Author)

Document Details

Document Type
Technical Report
Publication Date
Sep 01, 1961
Accession Number
AD0637726

Entities

People

  • C. Dennis Fink
  • Edgar L. Shriver
  • James E. Birdsall
  • Robert C. Trexler

Tags

Communities of Interest

  • Weapons Technologies

DTIC Thesaurus Topics

  • Availability
  • Bombs
  • Construction
  • Education
  • Guided Missiles
  • Guided Weapons
  • Materials
  • Munitions
  • Training
  • Training Devices
  • Weapons
  • Weapons Support Equipment

Readers

  • STEM Education
  • Software Engineering
  • Systems Analysis and Design