ELECTRON TUBES RADIATION RESISTANT PILOT LINE PRODUCTION.

Abstract

During the contract period all work required for the delivery of engineering samples, tube types 5886, 6360, 6205, and 6080WB, was completed with the exception of the high temperature (500 C) life testing of tube types 6360, 6205 and 5886 in alumino-silicate glass. The primary objective of the contract - to establish the techniques and controls for producing tubes with alumino-silicate enclosures - has been achieved. As a result of the information gained from the radiation tests and high temperature life tests, it became apparent that further efforts to establish pilot run capabilities would not be feasible. (Author)

Document Details

Document Type
Technical Report
Publication Date
Jun 10, 1966
Accession Number
AD0639610

Entities

People

  • William A. Buchanan

Tags

DTIC Thesaurus Topics

  • Contracts
  • Corpuscular Radiation
  • Electron Tubes
  • Electrons
  • Elementary Fermions
  • Elementary Particles
  • Engineering
  • Fermions
  • High Temperature
  • Ionizing Radiation
  • Life Tests
  • Nuclear Radiation
  • Production
  • Production Engineering
  • Radiation
  • Silicates

Readers

  • Aerospace Test and Evaluation
  • Electronics Engineering

Technology Areas

  • Microelectronics