PRODUCTION ENGINEERING MEASURE FOR MECHANIZATION OF HIGH RELIABILITY CAPACITORS.

Abstract

Modifications were completed during this period on four of the machines and a 500-capacitor trial run was made. Redesign was essential on many parts of Conveyor B before production could continue. The machinery was moved to a new environment and a 1200-capacitor trial run will be made early in the next quarter. (Author)

Document Details

Document Type
Technical Report
Publication Date
Jun 30, 1966
Accession Number
AD0639736

Entities

People

  • G. E. Walters
  • H. F. Phillips

Organizations

  • Sprague Electric

Tags

DTIC Thesaurus Topics

  • Capacitors
  • Conveyors
  • Engineering
  • Environment
  • High Reliability
  • Mechanization
  • Production
  • Production Engineering
  • Production Management Methods
  • Productivity
  • Reliability

Readers

  • Software Engineering