DEVELOPMENT OF EVALUATION PROCEDURES FOR PROTOTYPE DEVICES.
Abstract
The over all purpose of the project required a review of available sources of information as to methods and procedures presently used in the evaluation of training aids and devices. The purpose of this was threefold: (1) To interpret, from what had been done in evaluation of training aids and devices, the kinds of procedures and criteria which could be best applied to the present problem. (2) To classify the areas of training accomplishment through the use of aids and devices, so as to prepare materials for the rating and description of the effectiveness of this training. (3) To classify training aids and devices from the point of view of their training functions, so as to prepare procedures descriptive of the various classes. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Aug 01, 1962
- Accession Number
- AD0641600