PRODUCTION ENGINEERING MEASURE FOR TYPE CR-(XM-57)/U CRYSTAL UNITS.

Abstract

During the period the following work was performed: (1) Ordering of materials, (2) preliminary analysis of crystal designs and mounting structures, the improvement of edge finishing on the resonators, and the establishing of annealing procedures for the plated blank, (3) preparation of a PERT control system to cover the flow of the contract.

Document Details

Document Type
Technical Report
Publication Date
Jun 01, 1966
Accession Number
AD0642809

Entities

People

  • K. Dance

Tags

DTIC Thesaurus Topics

  • Annealing
  • Contracts
  • Control Systems
  • Engineering
  • Materials
  • Pert
  • Production
  • Production Engineering
  • Production Management Methods
  • Productivity
  • Resonators
  • Systems Engineering

Fields of Study

  • Physics

Readers

  • Logistics and Supply Chain Management.
  • Materials Science and Engineering.
  • Microwave Engineering.