A STRAIGHT-WALL CUT-AND-COVER SNOW TRENCH.

Abstract

A straight-wall cut-and-cover snow trench was constructed at Camp Century, Greenland, during the 1962 summer, to house tests performed by USA CRREL Project 33, Feasibility Study of Pile Foundations in Snow. In this report, the parameters used to design the trench and the equipment and methods used in the construction are presented and evaluated. Time-motion studies covering all phases of construction are included as a guide for planning and evaluation of similar construction. Performance is discussed and documented by instrumentation installed in the trench.

Document Details

Document Type
Technical Report
Publication Date
Oct 01, 1966
Accession Number
AD0646306

Entities

People

  • Donald L. Rissling
  • Wayne Tobiasson

Organizations

  • Cold Regions Research and Engineering Laboratory

Tags

DTIC Thesaurus Topics

  • Construction
  • Construction Equipment
  • Coverings
  • Feasibility Studies
  • Greenland
  • Instrumentation
  • Test And Evaluation
  • Test Equipment

Readers

  • Geotechnical Engineering.
  • Polar and Arctic Studies
  • Systems Analysis and Design