A TANDEM WIRE DRAWING AND INSULATING LINE,
Abstract
The payer describes the operation of the tandem wire drawing and insulating line, to the extent of what takes place between the supply reel of bare conductor and the high speed take-ups containing the finished product. This is only one of the major steps required in the manufacturing process of PIC cable. This step, along with the entire PIC manufacturing facilities, provides reliable PIC cable for use in communications.
Document Details
- Document Type
- Technical Report
- Publication Date
- Dec 09, 1966
- Accession Number
- AD0646546
Entities
People
- B. Batenburg
- C. R. Bauer