CENTER-WELL INSTALLATION OF USNS MIZAR (T-AGOR-11)

Abstract

A center-well installation on a former NRL assigned ship, USS HUNTING (EAG-398), is described in general terms. Some of the problems encountered with this center-well configuration are pointed out. The center-well installation of the USNS MIZAR (T-AGOR-11) is described in some detail. Factors which influenced the well design configuration are discussed. Also described are the carriage and cable towpoint system.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Jan 01, 1967
Accession Number
AD0647494

Entities

People

  • J. J. Gennari

Organizations

  • United States Naval Research Laboratory

Tags

Communities of Interest

  • Energy and Power Technologies
  • Ground and Sea Platforms

DTIC Thesaurus Topics

  • Abstracts
  • Bulkheads
  • Cables
  • Carriages
  • Contracts
  • Energy
  • Engineering
  • Kinetic Energy
  • Military Research
  • Oceans
  • Payload
  • Research Ships
  • Ships
  • Towed Bodies
  • Towed Vehicles
  • Transducers
  • Water

Readers

  • Marine Hydrodynamics
  • Wetland-Land-Environmental Management.