PRODUCTION ENGINEERING MEASURE FOR A PHASE II SUPER POWER HYDROGEN THYRATRON TUBE.

Abstract

Repair and improvement of the Phase II test equipment was completed and tests performed on tube No. 14 which contained increased baffling over that contained in earlier models. The tube performed over a wide reservoir range and demonstrated satisfactory operation at 50KV-1500 PPS conditions. Catastrophic failure occurred when the gradient-grid seal became defective. New test conditions are discussed. (Author)

Document Details

Document Type
Technical Report
Publication Date
Jun 06, 1966
Accession Number
AD0648730

Entities

People

  • A. E. Gordon

Tags

Communities of Interest

  • Energy and Power Technologies

DTIC Thesaurus Topics

  • Electron Tubes
  • Electronic Equipment
  • Engineering
  • Hydrogen
  • Production
  • Production Engineering
  • Production Management Methods
  • Productivity
  • Reservoirs
  • Test Equipment
  • Thyratrons

Readers

  • Aerospace Test and Evaluation
  • Electrical Engineering
  • Electronics Engineering