PERFORMANCE REQUIREMENTS AND TEST PROCEDURE TNL-5 LOW PASS FILTER.

Abstract

The specification includes requirements for: construction, serial numbering, visual inspection, test data, test equipment, tests and tagging.

Document Details

Document Type
Technical Report
Publication Date
Oct 30, 1952
Accession Number
AD0658093

Entities

People

  • W. J. Mayo-wells

Organizations

  • Johns Hopkins University Applied Physics Laboratory

Tags

DTIC Thesaurus Topics

  • Construction
  • Construction Equipment
  • Cooperation
  • Filters
  • Inspection
  • Low Pass Filters
  • Specifications
  • Test Equipment
  • Visual Inspection

Fields of Study

  • Physics

Readers

  • Aerospace Test and Evaluation