PERFORMANCE REQUIREMENTS AND TEST PROCEDURE TQR-1A STANDARD BRIDGE ADAPTER,

Abstract

The specification includes requirements for: construction, serial numbering, visual inspection, calibration, operational tests, and tagging.

Document Details

Document Type
Technical Report
Publication Date
Oct 30, 1952
Accession Number
AD0658119

Entities

People

  • W. J. Mayo-wells

Organizations

  • Johns Hopkins University Applied Physics Laboratory

Tags

DTIC Thesaurus Topics

  • Calibration
  • Construction
  • Cooperation
  • Inspection
  • Specifications
  • Standards
  • Test And Evaluation
  • Visual Inspection